Home
/
Blog

How to Ship Heavy Equipment: Step-By-Step Guide for Shippers

How to Ship Heavy Equipment: Step-By-Step Guide for Shippers

Shipping heavy equipment is a complex operation that requires precision, planning, and strict adherence to transportation regulations. Whether you’re moving construction machinery, agricultural equipment, industrial machines, cranes, generators, or large commercial assets, one thing remains true: oversized and overweight freight cannot be handled like standard truckload shipments.

From equipment specs to permits, from carrier selection to route planning, and from trailer choice to securement, every detail matters. Mistakes cost time, money, and in the worst cases, safety or legal penalties.

As a full-service logistics provider, Freight Squad ensures shippers across construction, agriculture, manufacturing, and industrial sectors have a trusted partner who manages heavy-equipment transport from start to finish. This step-by-step guide breaks down the process clearly, helping you understand what’s required and how to move equipment safely, efficiently, and in full compliance with U.S. regulations.


1. Start With Exact Equipment Specifications

Successful heavy-equipment shipping starts with accurate specifications. Oversize and overweight loads trigger complex routing, permit requirements, and specialized equipment decisions.

Key specs you must provide:

  • Weight (total and axle distribution, if available)

  • Dimensions (length, width, height)

  • Ground clearance

  • Attachments or protruding components

  • Operational condition (running, rolling, or non-operational)

  • Pickup and delivery conditions (dock, yard, jobsite, or restricted access)

Why this matters

  • DOT and FMCSA regulations rely on exact equipment measurements.

  • State oversize/overweight permits require precise dimensions—errors cause delays.

  • Trailer type and securement depend heavily on weight and height.

  • Route planning changes dramatically for tall or wide loads.

Freight Squad verifies your specifications and ensures carriers match the exact requirements of your equipment.


2. Choose the Right Trailer for Transport

Different machines require different heavy-haul trailers. Selecting the wrong type is one of the most common mistakes shippers make.

Primary trailer types for heavy-equipment shipping:

• Flatbed Trailers

Suitable for smaller, standard-dimension equipment or machinery under height limits.

• Step Deck Trailers

Ideal when equipment is slightly taller; lower deck height helps avoid over-height restrictions.

• Double Drop Trailers

Used for taller, bulkier equipment that exceeds standard height limits.

• RGN (Removable Gooseneck) Trailers

A top choice for drivable equipment—ramps allow machinery like dozers or loaders to roll directly onto the deck.

• Multi-Axle Heavy-Haul Trailers

Required for extremely heavy or oversized freight such as cranes or industrial components.

How Freight Squad Helps

We assess equipment details and match your shipment to the correct trailer, taking into account:

  • Weight distribution

  • Height requirements

  • Road clearance

  • State axle and load regulations

This ensures safe movement and compliance with DOT and FMCSA standards.


3. Understand Regulatory Compliance: DOT, FMCSA & State Oversize Rules

Heavy-equipment shipping is regulated at multiple levels, and compliance is not optional.

DOT & FMCSA Regulations Cover:

  • Driver qualifications and endorsements

  • Axle weight limits

  • Securement rules (minimum chains, binders, anchor points)

  • Trailer & vehicle safety inspections

  • Hours of service (HOS)

  • Oversized/overweight movement restrictions

State-Specific Oversize Rules

These vary widely and may include:

  • Travel-hour limitations (no nights, no weekends, no holidays)

  • Curfews for major metro areas

  • Requirements for escort/pilot cars

  • Route restrictions (low bridges, road construction, load-restricted bridges)

  • Height and width variance between states

Weight Limits & Axle Restrictions

Shippers must consider:

  • Federal Bridge Formula

  • Axle spacing

  • Gross vehicle weight (GVW)

  • Multi-axle requirements

Trailer Securement Rules

All securement must meet FMCSA criteria, including:

  • Chain grade requirements

  • Minimum WLL (working load limit)

  • Secondary securement for attachments

  • Tie-down angle standards

  • Proper blocking & bracing

Freight Squad handles compliance for you, reducing the risk of delays, citations, or halted shipments.


4. Secure Necessary Permits & Escort Vehicles

Oversize and overweight shipments frequently require state permits, sometimes per state traveled.

Permits you may need include:

  • Oversize load permits

  • Overweight permits

  • Superload permits (for extreme dimensions)

  • County or municipal clearances (in specific areas)

Escort/Pilot Vehicles

Escort cars are often required when loads exceed certain:

  • Width

  • Height

  • Length

  • Weight thresholds

They may include:

  • Standard pilot vehicles

  • Height-pole cars

  • Police escorts (for very large loads)

Freight Squad’s Role

We manage:

  • Permit applications

  • Route approvals

  • Escort scheduling

  • Pilot and police coordination

  • Multi-state compliance review

This removes one of the most stressful parts of heavy-equipment shipping for shippers.


5. Prepare Equipment Properly Before Pickup

Poor preparation leads to damage, delays, and added costs. Shippers should ensure:

Before transport:

  • Remove loose parts or attachments (or secure them properly)

  • Drain fluids if required (varies by state & equipment type)

  • Disconnect batteries if needed

  • Lock moving parts

  • Cover sensitive components

  • Verify tires, tracks, and hydraulics are stable for loading

  • Clean equipment to avoid DOT inspection issues

Freight Squad provides preparation guidance based on equipment type and regulatory standards.


6. Loading, Securement & Safety Procedures

Loading heavy equipment is a high-risk process that must follow FMCSA securement regulations.

Loading Considerations:

  • Use appropriate ramps and angle approaches

  • Check ground stability before loading

  • Ensure proper spotting and communication signals

  • Maintain a safe perimeter around the loading zone

  • Confirm brakes and steering are functioning (if equipment is drivable)

Securement Requirements:

FMCSA typically requires:

  • A minimum of four chains for heavy equipment

  • Bindings rated for the equipment’s weight

  • Additional securement for attachments (buckets, blades, booms, etc.)

  • Wheel or track chocks

  • Tie-downs positioned to prevent forward, backward, and lateral movement

Freight Squad works only with carriers who meet or exceed federal securement standards, ensuring the highest level of safety.


7. Plan the Route Carefully

Heavy equipment cannot take standard truck routes. Route planning is one of the most critical stages in the process.

Route Planning Factors:

  • Bridge weight limits

  • Low bridge clearances

  • Construction zones

  • Road width restrictions

  • Curves and grade limitations

  • High-traffic zones

  • State-by-state travel curfews

Freight Squad performs comprehensive route mapping, ensuring legal compliance, predictable transit times, and safer transport.


8. Schedule Pickup & Delivery With Precision

Construction sites, industrial plants, and agricultural operations often have restricted access or limited availability. Coordination must be exact.

Coordination considerations include:

  • On-site loading equipment (cranes, forklifts, ramps)

  • Weather-related risks

  • Ground conditions (mud, gravel, incline)

  • Timing to avoid operational disruptions

  • Safety personnel availability

Freight Squad ensures communication between shipper, carrier, and receiving team is seamless throughout the process.


9. Track Your Shipment in Real Time

Heavy-equipment shipping requires visibility, especially for oversized or high-value loads.

Freight Squad provides:

  • Real-time tracking

  • Status updates

  • Carrier communication

  • Delay notifications

  • Delivery confirmation

This ensures shippers have clear oversight from pickup to delivery.


10. Work With a Full-Service Logistics Provider

Shipping heavy machinery on your own can quickly become overwhelming. Regulations, routing, trailers, securement, escorts, permits, and safety standards all impact cost and risk. A full-service logistics partner eliminates uncertainty.

Freight Squad Provides:

  • Trailer selection & carrier vetting

  • Permit coordination

  • Escort & pilot car scheduling

  • Route planning

  • Oversized/overweight compliance

  • Real-time tracking

  • Insurance guidance

  • End-to-end shipment management

Your team stays focused on operations while we manage the logistics.


Ready to Ship Heavy Equipment? Get a Quote Today

Whether you’re transporting construction machinery, industrial equipment, agricultural assets, or specialized heavy freight, the right planning ensures your shipment arrives safely, legally, and on time.

Get a quote today and let Freight Squad manage your heavy-equipment transport from start to finish.